Madhyanchal Vidyut Vitran Nigam Limited
ImprovingAT&C losses, FY16 → FY23
27.9%
Latest
Uttar Pradesh is drawing 18,302 MW of electricity at the current hour (2026-06-18T09:00:00+05:30 IST), per the India Energy Atlas state-page-live snapshot.
The most recent in-state generation stack for Uttar Pradesh is dominated by coal at 92.6% of the metered mix. Grid carbon intensity is 933 gCO2/kWh.
Hourly disaggregation for Uttar Pradesh is awaiting the cross-project Atlas DISCOM Disaggregation tier-A endpoint; once it lands the live page will surface P10/P50/P90 bands without any FE change.
Composed at 2026-06-18T09:00:00+05:30
Weather sensitivity
No nightly snapshot available yet for this state. Endpoint may not be deployed; see IEA-1023.
Slope
—
R²
—
Confidence
—
Demand's sensitivity to temperature (MW per degree) is what turns a heatwave forecast into a load forecast. A high, tight slope means cooling load dominates and peaks are weather-driven and forecastable; a weak or noisy slope means the swing factor is something else — industrial shifts, agriculture, or a data gap worth questioning.
We do not show a modeled-vs-actual chart for Uttar Pradesh because no live SLDC scrape; only modeled + monthly-synthesized data exists for this jurisdiction. Accuracy scoring requires an independent live actual.
A carbon scorecard isn't published for Uttar Pradesh yet — it appears once enough hourly generation history has accumulated.
Policy & RE Transition
Renewable Purchase Obligation: MNRE target trajectory vs SERC-reported actual compliance.
Latest actual
FY23 · modelled
Shortfall
vs FY23 target
A Renewable Purchase Obligation is statutory, not aspirational: a state utility must source a set share of its energy from renewables or pay a penalty. A widening shortfall against the MNRE trajectory is an early signal of either a procurement gap or a banked-REC scramble at year-end — both move power and REC prices.
No solar capture-rate payload returned for Uttar Pradesh.
Generation mix
Each band is a fuel's share of generation each hour — watch the solar wedge swell midday and coal hold the baseload, independent of total load.
SOURCE: SLDC fuel mix · UPDATED 09:30 IST
Reliability — POSOCO PSP
All-time state peak
Days with shortage
Within window
Cumulative shortage
Energy not served
Worst single day
No shortage in window
Adequacy calendar
Energy shortage by day
Each square is one day. Color intensity = energy shortage (MU).
Loading 90-day adequacy strip
An hourly residential cost curve isn't published for Uttar Pradesh yet — it appears once the underlying tariff data is available.
Residential Tariff
| Slab | ₹/kWh |
|---|---|
| 0–100 kWh | ₹3.00 |
| 100+ kWh | ₹7.00 |
| 100–100 kWh | ₹3.00 |
10-Year Tariff History
Residential · 1 order
DISCOM Health
Aggregate Technical & Commercial losses per distribution utility, with multi-year trend.
Madhyanchal Vidyut Vitran Nigam Limited
ImprovingAT&C losses, FY16 → FY23
27.9%
Latest
Paschimanchal Vidyut Vitran Nigam Limited
ImprovingAT&C losses, FY16 → FY23
17.9%
Latest
Aggregate Technical & Commercial losses per PFC's Annual Integrated Rating of State Power Distribution Utilities. Backfilled FY16 onwards where published. Latest published edition is the 13th Rating (FY22-23 data); forward-year cells marked is_modeled=true.
AT&C (Aggregate Technical & Commercial) loss is the single clearest read on a distribution utility's solvency. Every percentage point is power delivered but never billed or collected; a worsening trend tells you a DISCOM is heading toward the payment delays that ripple back to gencos and IPPs.
INSIGHTS
The Uttar Pradesh Electricity Regulatory Commission (UPERC) has approved the disbursal of ₹11.22 crore from the Power System Development Fund (PSDF) for the procurement of Remote Terminal Units (RTUs) to strengthen data acquisition, grid monitoring and load management across…
Syndicated from Saur Energy International · Open original →

NTPC Renewable Energy (NTPC REL) has announced the winner of its auction for the engineering, procurement, and construction (EPC) of a 250 MW solar project with a 50 MW/200 MWh battery energy storage system (BESS) in Sitapur, Uttar Pradesh.
Syndicated from Mercom India · Open original →
Bondada Engineering Ltd has secured a ₹1,338-crore engineering, procurement and construction (EPC) contract from NTPC Renewable Energy Ltd (NTPC REL) for a 250 MW solar photovoltaic project integrated with a 50 MW/200 MWh battery energy storage system (BESS) in Uttar Pradesh.…
Syndicated from Saur Energy International · Open original →

The Central Electricity Regulatory Commission (CERC) has underscored the contractual responsibilities of power traders in long-term power procurement arrangements, delivering a significant ruling in the dispute between TRN Energy Pvt Ltd, PTC India Ltd and Uttar Pradesh power…
Syndicated from Saur Energy International · Open original →

The Uttar Pradesh Electricity Regulatory Commission (UPERC) has adopted a tariff of ₹2.24 (~$0.024)/kWh for procuring power from a 5 MW grid-connected solar photovoltaic project to be established in Saraisadi village in Uttar Pradesh’s Mau district.
Syndicated from Mercom India · Open original →
Statcon Energiaa has signed a memorandum of understanding (MoU) with Ram Raja Solar to supply battery energy storage systems (BESS) and hybrid inverter solutions for commercial and industrial solar-plus-storage projects in Uttar Pradesh.
Syndicated from PV Magazine India · Open original →
HVR Solar is establishing a 1.2 GW TOPCon solar cell manufacturing facility in Uttar Pradesh's Amroha district.
Syndicated from PV Magazine India · Open original →
HVR Solar has signed a series of global memorandums of understanding (MoUs) to establish a proposed 1.2 GW TOPCon solar cell manufacturing facility in Uttar Pradesh, marking the company's entry into solar cell manufacturing and expanding its presence across the solar value…
Syndicated from Saur Energy International · Open original →

The Uttar Pradesh New and Renewable Energy Development Agency (UPNEDA) has invited bids for the supply, installation, testing and commissioning of 6,000 solar-powered lighting systems across multiple districts of the state, in a tender valued at nearly Rs 96 crore. According to…
Syndicated from Saur Energy International · Open original →

The Central Electricity Regulatory Commission (CERC) has approved revised transmission tariffs for Power Grid Corporation of India's (PGCIL) extensive 765 kV inter-regional transmission network that facilitates power transfers, including renewable energy flows, from the Eastern…
Syndicated from Saur Energy International · Open original →

Grid reliability
Each cell is a day's unmet peak demand (POSOCO). Green = fully met; redder = larger shortfall — occasional stress days stand out against the reliable run.
Peak demand fully met every day
SOURCE: Grid-India PSP (daily) · UPDATED 16 Jun