Load
150.2MW
2 May 2026, 12:11 am IST
Generation
139MW
Installed generation capacity
Carbon intensity
24gCO2/kWh
Clean operating band
Main source
Hydro
Dominant hourly generation fuel
Loading fuel mix
Infrastructure map
State-focused topology with density heatmap enabled at low zoom.
Loading satellite base map
Read this first
Current operating context
Load is 150.2 MW against 139 MW installed capacity.
Hydro is the dominant generation source.
24 gCO2/kWh now; 0 MW solar and wind capacity mapped.
Loading hourly load
Loading peak events
Loading operations table
Loading carbon intensity
Loading two-year trace
Loading POSOCO visualizations
Fuel mix
Hourly in-state generation by fuel for Mizoram.
Load
Modeled SLDC reconstruction.
Reliability — POSOCO PSP
All-time state peak
2026-01-31
Days with shortage
Within window
Cumulative shortage
Energy not served
Worst single day
Calendar
Energy shortage by day
Carbon
gCO2/kWh with operating bands at 400 and 700.
Peaks
Highest measured or reconstructed state load events in the rolling window.
Operations table
| Metric | Value | Context |
|---|---|---|
| Latest daily peak | No data | Daily summary |
| Two-year peak | No data | Demand archive |
| POSOCO all-time peak | 173 MW | 2026-01-31 |
| Days with shortage | 0 days | 0 MU in last 90 days |
| Worst shortage day | No data | Last 90 days |
| Residential tariff | Rs 0.00/kWh | 1 DISCOM |
| Industrial tariff | Rs 5.50/kWh | MZERC (Mizoram Electricity Regulatory Commission) / JERC (M&M) |
Daily peak / average / minimum demand for the last two years, blending official SLDC feeds with the modeled reconstruction.