Load
20,126.3MW
2 May 2026, 1:13 am IST
Generation
33,353MW
Installed generation capacity
Carbon intensity
849gCO2/kWh
High-carbon operating band
Main source
Thermal
Dominant hourly generation fuel
Loading fuel mix
Infrastructure map
State-focused topology with density heatmap enabled at low zoom.
Loading satellite base map
Read this first
Current operating context
Load is 20,126.3 MW against 33,353 MW installed capacity.
Thermal is the dominant generation source.
849 gCO2/kWh now; 0 MW solar and wind capacity mapped.
Loading hourly load
Loading peak events
Loading operations table
Loading carbon intensity
Loading two-year trace
Loading POSOCO visualizations
Fuel mix
Hourly in-state generation by fuel for Madhya Pradesh.
Load
Actual SLDC feed.
Reliability — POSOCO PSP
All-time state peak
2026-02-14
Days with shortage
Within window
Cumulative shortage
Energy not served
Worst single day
2026-03-14
Calendar
Energy shortage by day
Each square is one day. Color intensity = energy shortage (MU).
Carbon
gCO2/kWh with operating bands at 400 and 700.
Operations table
| Metric | Value | Context |
|---|---|---|
| Latest daily peak | 20,805 MW | 2026-05-02 |
| Two-year peak | 25,126 MW | 2026-04-25 |
| POSOCO all-time peak | 19,187 MW | 2026-02-14 |
| Days with shortage | 13 days | 5.9 MU in last 90 days |
| Worst shortage day | 0.8 MU | 2026-03-14 |
| Residential tariff | Rs 3.50/kWh | 3 DISCOMs |
| Industrial tariff | Rs 6.35/kWh | MPERC |
Daily peak / average / minimum demand for the last two years, blending official SLDC feeds with the modeled reconstruction.
Latest peak
20,804.6 MW
2-yr peak
25,125.8 MW
2-yr average
11,818 MW
Most recent: 2026-05-02
Peaks